NYC Energy Compliance & Decarbonization

New York City buildings evaluated for boiler-to-heat-pump electrification

Building Electrification in NYC: What to Evaluate Before Replacing a Boiler with Heat Pumps

Replacing an NYC building boiler with heat pumps requires more than equipment selection. Learn how heating loads, distribution temperatures, electrical capacity, ASHP and WSHP options, controls, phasing, and Local Law 97 targets shape the right solution.

Mechanical room piping system with pumps, valves, gauges, and controls

Local Law 87 Energy Audits and Retro-Commissioning: What Building Owners Should Expect

Local Law 87 requires covered NYC buildings to complete an energy audit and retro-commissioning every ten years. Learn what owners should expect—from confirming the due date and preparing records to field testing, corrective work, and filing the Energy Efficiency Report.